§ 2. Building permit fee schedules.


Latest version.
  • Following are Schedules I, II, and III regarding building permit fees.

    SCHEDULE I

    Occupancy Classification and Types TYPE OF CONSTRUCTION
    I II III IV V VI
    1-HR UNP 1-HR UNP 1-HR UNP
    ASSEMBLY
    Auditorium 99.50 96.00 76.50 47.50 46.50 75.50 72.50 72.00 69.00
    Church 99.00 95.50 77.50 68.00 66.50 76.00 73.50 73.00 70.00
    Gymnasium 79.50 79.50 63.00 56.50 54.50 62.00 59.00 59.00 55.50
    Restaurant 83.50 83.50 70.50 63.00 61.00 69.50 66.50 65.50 62.50
    Theater 97.00 94.00 65.00 58.50 56.50 64.50 61.00 61.00 58.00
    BUSINESS
    Office 82.50 79.50 62.50 53.50 52.00 61.50 58.50 57.50 54.00
    Research/Eng. 51.50 49.50 45.50 39.50 38.00 44.50 41.00 41.00 38.00
    Service Station 90.50 86.50 70.00 67.50 66.00 69.00 66.00 55.50 52.50
    EDUCATIONAL
    School 77.50 71.50 64.50 58.00 56.50 63.00 60.00 61.00 58.00
    FACTORY—INDUSTRIAL
    Factory (light mfg.) 32.00 30.50 33.50 27.50 26.00 32.50 29.00 29.00 26.00
    HAZARDOUS
    Hazardous 34.00 32.50 34.50 29.50 27.50 34.00 30.50 31.00 28.00
    INSTITUTIONAL
    Convalescent Hospital 104.00 101.50 76.50 68.50 66.50 75.50 N/P 72.50 N/P
    Hospital 123.50 121.00 103.50 68.50 66.50 102.50 N/P 96.50 N/P
    MERCANTILE
    Department Store 70.00 68.00 61.00 44.00 42.00 60.00 57.00 45.50 42.50
    Mall Stores 79.00 79.00 57.50 52.50 51.00 56.50 53.50 54.00 50.50
    Mall Concourse 63.50 63.50 46.50 44.00 42.50 45.50 42.50 45.00 42.50
    Retail Store 55.50 54.00 49.00 44.00 42.00 48.00 45.00 45.50 42.50

     

    SCHEDULE II

    Occupancy Classification and Types TYPE OF CONSTRUCTION
    I II III IV V VI
    1-HR UNP 1-HR UNP 1-HR UNP
    RESIDENTIAL
    Apartments 65.50 63.00 54.50 48.50 47.50 53.50 50.50 50.50 47.00
    Dormitories 78.50 76.50 65.50 59.00 58.00 64.50 61.50 60.00 56.50
    Homes for Elderly 79.00 76.50 68.50 63.00 61.00 67.50 64.50 64.50 61.50
    Hotel 77.00 75.00 64.50 53.00 51.00 64.00 64.00 58.50 55.00
    Motel 77.00 75.00 57.50 53.00 51.00 56.50 53.00 54.50 51.50
    Single-Family Residence 69.00 66.50 59.00 53.50 51.50 58.00 55.00 53.00 50.00
    STORAGE
    Auto Parking Structure 28.50 27.50 26.50 27.50 26.50 N/P N/P N/P N/P
    Private Garage 28.50 27.50 33.00 27.50 26.00 32.00 28.50 30.00 26.50
    Repair Garages 37.00 37.00 35.50 28.00 26.00 34.50 31.00 30.00 27.00
    Warehouse 37.00 35.00 29.50 24.00 22.00 28.50 25.00 25.50 22.00

     

    NOTE:

    N/P = Not permitted by Code.

    Other structures or projects, additions/remodel dwelling:

    Garage to living area with plumbing, $10.50

    Garage to living area without plumbing, $8.00

    Carport to living area with plumbing, $14.50

    Carport to living area without plumbing, $12.00

    Carport to garage or storage, $4.00

    Patio cover to screen room, $8.00

    Patio cover enclosed with screen, $4.00

    Storage shed, $10.00

    Fence (wood), $10.00

    Fence (brick), $40.00

    Trailer park. Contract Price

    Pool (private), Contract Price

    NOTE: Where appropriate, the code official may accept the use of a contract price in lieu of valuations calculated.

    SCHEDULE III

    PERMIT FEES

    Total Valuation Fees
    $0.00 to $1,000.00 $15.00 fee (minimum permit fee)
    $1,001.00 to $50,000.00 $15.00 for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $50.000.00
    $50,001.00 to $100,000.00 $260.00 for the first $50,000.00 plus $4.00 for each additional thousand or fraction thereof, to and including $100,000.00
    $100,001.00 to $500,000.00 $460.00 for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00
    $500,001.00 and up $1,660.00 for first $500,000.00 plus $2.00 for each additional thousand or fraction thereof

     

    NOTE: For all new residences built in accordance with the 1995 CABO One and Two Family Dwelling Code, the determined permit fee shall be multiplied by 0.75 to determine the final building permit fee.

    When an after-hours inspection by the building, electrical, gas, mechanical or plumbing departments is requested by any licensed contractor for inspections during other than designated working hours, a minimum fee of $100.00 shall be charged for the first four hours and a fee of $25.00 for each additional hour or fraction thereof.

    Where work requiring a permit by the city Code is started prior to obtaining said permit, the fees above specified may be increased by 100 percent, at the discretion of the code official, but the payment of such fee shall not relieve any person from fully complying with the requirements of this Code in the execution of the work, nor from any other penalties prescribed herein.

    Where work requiring a permit for removal and demolition is started prior to obtaining said permit, the fees above specified shall be increased by 300 percent, but the payment of such fee shall not relieve any person from fully complying with the requirements of the city Code in the execution of the work, nor from any other penalties prescribed herein.